Checked against primary sources 2026-09-05
The honest version
Georgia and the 2026 NEC: No Adoption Underway Yet
Georgia is on the 2023 National Electrical Code and nothing we can find says a 2026 adoption is in progress. This page shows what we checked, what an adoption would change for a candidate and a contractor, and why we're not putting a date on it.
Test yourself: thirty free questions, timed
On this page
What we checked, and what it says
The Department of Community Affairs page listing the current state minimum standard codes names the National Electrical Code, 2023 Edition, with Georgia Amendments. It names no later edition.
The DCA announcement of the codes that took effect on January 1, 2026 names the electrical item as the 2026 Georgia Amendments to the 2023 National Electrical Code. Again, no later edition.
The State Codes Advisory Committee page, which is where DCA points for the full package, carries the amendment packets published under the January 1, 2026 codes and names no NEC edition after 2023.
So the honest answer is that we found no adoption process for the 2026 National Electrical Code in Georgia. That isn't the same as knowing there's no work happening. It's what three official pages show as of the date on this page.
The pattern Georgia follows
The last cycle gives you the shape of it. The State Codes Advisory Committee recommends, the DCA Board adopts, an announcement goes out, and the package takes effect on January 1.
That announcement was published on December 9, 2025 for codes effective January 1, 2026, so the public notice came a few weeks before the effective date, with the amendment packets published alongside.
Notice what Georgia did with the electrical code that cycle. Most of the package moved to a 2024 edition of its model code while the NEC stayed on 2023 and took a fresh amendment packet instead. A state that's willing to re-amend rather than re-adopt isn't a state you should assume moves on the national cycle.
What would change if Georgia moved to the 2026 book
Two kinds of change, and the second is the one that costs money.
Numbers that move
- Load calculations for branch circuits, feeders and services would sit in Article 120 in the 2026 book (Article 220 in the 2023 edition Georgia uses now), and Article 220 would be vacant.
- Energy management systems would be Article 130 in the 2026 book (Article 750 in the 2023 edition Georgia uses now).
- Overcurrent protection of transformers would be 450.5 in the 2026 book (450.3 in the 2023 edition Georgia uses now).
- Protection against physical damage would be 300.6 in the 2026 book (300.4 in the 2023 edition Georgia uses now).
- Wire bending space would be 312.9 in the 2026 book (312.6 in the 2023 edition Georgia uses now).
- The bar on re-bonding neutral to ground downstream would be 250.24(B) in the 2026 book (250.24(A)(5) in the 2023 edition Georgia uses now).
- Everything over 1000 volts would spread across Articles 265 through 268 with grounding at 270 in the 2026 book (Article 235 in the 2023 edition Georgia uses now).
A value that moves
The dwelling general lighting unit load is a single 3 volt-amperes per square foot in the 2023 book. The 2026 edition splits it, keeping 3 for branch circuits and dropping to 2 for feeders and services. That changes the size of a service, not just the number you cite.
A rule about how the book is read
The 2026 edition rewrote 90.3, the section that says how the chapters relate. Through the 2023 edition Chapter 8 stood outside the arrangement. In the 2026 wording, Chapters 5 through 8 may supplement or modify Chapters 1 through 8, which changes how a communications job is read against the front of the book.
The Georgia amendments would have to be rewritten
This is the part that makes a quick adoption unlikely to be quick. Georgia's current packet amends 210.8, 210.12, 210.52, 215.18, 225.42, 230.67, 517.40 and 517.45 and adds a definition to Article 100.
Any move to a new edition means checking every one of those against the new text and the new numbering, then republishing the packet. That's committee work with meetings attached to it.
Our record of what moved between the 2023 and 2026 editions has no entry for most of those sections, so much of the numbering may survive. One does not: Article 225 ends at 225.41 in the 2026 text, so the packet's 225.42 has no 2026 counterpart on our record and the committee would have to find the rule its new address. The text under all of them would still need reading.
When the exam would move, which is a separate date
The code and the exam are two different clocks. PSI's bulletin sets the reference list, and today that list names the Georgia State Electrical 2023 National Electrical Code.
So even on the day a new edition took effect for inspections, the exam would test whatever edition the bulletin names until the bulletin changes.
Check the bulletin before you buy a book for an exam. It's the document that decides what you carry in, and it's free to read.
What to do about it now
Buy the 2023 code and the Georgia amendment packet. That's the state's code and the exam's reference, and no announcement contradicts either.
Don't buy a 2026 code for a Georgia exam, and be careful with training material published on the 2026 edition. It isn't wrong, it's addressed to a different book. Which edition the exam uses lists every number that differs.
We'll change this page when DCA publishes something, and the change will be logged with the date on the corrections page. We're not going to guess at an adoption year to fill the space.
Questions people ask
When will Georgia adopt the 2026 NEC?
No adoption is named on DCA's current codes page, the January 2026 announcement or the State Codes Advisory Committee page. We have no date, and we're not predicting one.
Is Georgia behind on the code cycle?
Georgia enforces the 2023 National Electrical Code and re-amended it effective January 1, 2026, while most of the rest of its package moved to 2024 model codes. That's a choice the state made rather than a backlog we can measure.
What would change most if Georgia moved to the 2026 book?
Load calculations would move from Article 220 to Article 120, and the dwelling unit load for feeders and services would drop from 3 volt-amperes per square foot to 2. The second one changes service sizes, not just citations.
Would the Georgia amendments carry over?
They would have to be checked against the new text and republished. The current packet amends nine places in the code, and that is committee work rather than a find and replace.
Would the exam change on the same day?
No. PSI's bulletin sets the reference list, and it names the 2023 edition today. The exam tests whatever the bulletin names, whenever that changes.
Should I buy a 2026 code book now?
Not for a Georgia exam or for Georgia work. Buy the 2023 edition and keep the Georgia amendment packet with it.
Thirty free questions, timed, with the working shown
Every miss comes back with the arithmetic worked out and the code section named, so you learn the trap and not just the answer. No account.
All questions here are original. They are not actual exam questions, and no question bank can promise you a pass.
What this page cites
- Georgia DCA, current state minimum standard codes The page that lists the 2023 National Electrical Code with Georgia Amendments among the mandatory state minimum standard codes. Read 5 September 2026. source
- Georgia DCA announcement, new codes effective January 1, 2026 The DCA Board's adoption announcement, which names the electrical item as the 2026 Georgia Amendments to the 2023 National Electrical Code. Read 5 September 2026. source
- Georgia State Codes Advisory Committee The committee page DCA points at for the full package. It carries the amendment packets listed under the January 1, 2026 codes and names no NEC edition after 2023. Read 5 September 2026. source
- Georgia State Amendments to the National Electrical Code, 2023 Edition The amendment packet itself, effective January 1, 2026, with two health care items held to January 1, 2027. Read 5 September 2026. source
- NEC 2026 renumbering, article by article Our own record of the article and section numbers that changed address between the 2023 and 2026 editions, each one read in the 2026 text before it went on the list. source
- PSI candidate information bulletin 4783, Georgia electrical contractors PSI's own bulletin for the Georgia electrical contractor examinations. Source for the item counts, the content outline, the eight hours in two parts, the scaled 70, the reference list, the marking rules, the identification rules and the review course after two failures. Read 5 September 2026. source
The 2023 to 2026 section crosswalk maps every section that moved, both directions, $29 once.